FERROCOM PTY LTD
Structural steel fabrication and erection solutions
Our team has the experience and capacity to deliver your project safely, to specification, and on time.
ABOUT US
Operating out of Sydney's North West, our Factory is 3000m2 with a yard size of 5 acres
7 overhead cranes (up 20T SWL) with an extra high factory giving ability to utilise mobile cranage inside
CNC Beamline Processing
In house abrasive blasting and protective coating (PCCP accredited) specialising in architectural finishes
In house semi and hiab transport, Franna and Mobile Cranage
FACILITY
RECENT PROJECTS
A selection of current/recently completed works, please click to enlarge slideshow images
EASTERN CREEK GPT
Eastern Creek GPT
480T of structural steel fabrication and installation
June 18 to Nov 18
Ferrocom was chosen due to the extremely tight deadline, workshop operated 24hrs to feed 2 crane erection crews on site
KEYLINK MINTO
120T of structural steel, platforms and stairs fabrication and installation
May 18 to June 18
Entire building height was raised by 1m to suit final client requirement after fabrication had commenced with minimal disruption to final deadline
SYDNEY METRO
300T of Bridge Steel (Crows Nest) fabrication and installation
Jan 18 to Apr 19 (2 stages)
Noise and access restrictions while installing large (average size 14T) beams in a residential area beside the Pacific Highway
PLUNGE COLUMNS
1300kg/m grade 450+ hot rolled members, faces machined then welded together to create columns weighing 40T each!
STAIRS AND PLATFORM
Installation of stairs and platform at new Target Distribution Facility
June 2019
Work performed around conveyors and equipment
NEPEAN BRIDGE PLATFORMS
Fabrication of access structures and support cradles for the assembly work on the new Nepean Bridge
HAZELBROOK LIFT SHAFT/BALUSTRADING
10m high lift shaft (one piece), balustrading, awnings and screen supports.
June, 2019
24 hour shifts were required to meet tight deadline from our client
BONDI PROJECT
Retrofitting structural steel into existing building
July, 2019
Phototelemetric 3D scanning used to ensure millimetre perfect installation.
CRANE BEAM EXTENSIONS
9m extensions to 3 off existing crane beams to increase length to 29m
December 2018
PICTON COLAS
4 x COLAS at Picton Temporary High School
December 2018
CROWS NEST TEMPORARY STEEL
Temporary Platform steel
November 2018
COMMERCIAL DEVELOPMENT
Riverstone commercial development
January 2019
CONTACT US
12 Anvil Road
Seven Hills, 2147
Australia
02 4573 8805